
Site Environmental Assessment and Risk Control for Soil and Groundwater Contamination
Multiple industrial sites, People’s Republic of China, 2017 – 2022
Client: International manufacturing companies (including Johnson Electric, Cummins, Bayer)
Role: Environmental Assessment Consultant
Project Background and Objectives
International manufacturing companies, including Johnson Electric, Cummins, and Bayer, commissioned SIET to conduct environmental assessments and manage soil and groundwater contamination risks at existing and planned industrial sites. The objective was to identify potential environmental liabilities, assess exposure risks, and develop appropriate risk control measures to support land development, facility expansion, and regulatory compliance.
SIET’s Role and Services
SIET delivered comprehensive site environmental assessment and risk management services tailored to the needs of industrial clients. Key activities included:
- Site reconnaissance and historical land use review
- Field investigation, sampling, and laboratory analysis of soil and groundwater
- Phase I and Phase II Environmental Site Assessments (ESA)
- Identification and characterization of contaminants of concern
- Pollutant exposure and environmental risk analysis
- Preparation of environmental risk control and management plans to support land development and site reuse
Outcomes and Value Added
By integrating field investigations with risk-based analysis, SIET provided clients with clear, actionable insights into environmental conditions and contamination risks. The resulting risk control plans supported informed decision-making on site development, remediation needs, and environmental compliance, reducing potential liabilities and enabling sustainable industrial operations.
